Renovation Project Management (EU Edition)

Sale Price: €2.99 Original Price: €6.99

Most renovations do not fail on the building work. They fail on decisions made late, money tracked loosely, and expectations nobody wrote down. The bricklaying is usually fine. The managing is where projects come apart.

Renovation Project Management is a 36-page illustrated handbook from award-winning London studio Akiva, written for homeowners rather than professionals. It assumes you have a job to hold down while all this is happening, and that nobody has ever explained how a building project is actually shaped.

It starts with the scope, because everything downstream inherits its clarity, and shows you how to write one a builder can price without phoning to ask what you meant. Then choosing a team, reading a quote properly, and the conversation that tells you more than any reference. Then contracts: what the document must state, how retention works, how to pay safely, and what insurance to verify before anyone starts.

UK edition: Written around JCT Home Owner contracts, CDM 2015 domestic client duties, the Party Wall Act and building control inspections, with prices in pounds.

EU edition: Written around national contract forms, Directive 92/57/EEC safety coordination and local building inspectorates, with prices in euros.

The middle chapters are about running a live project: the critical path and the lead times that quietly wreck programmes, a five-column money sheet that catches overruns while you still have options, and the four habits that prevent most renovation misery. A weekly meeting. A written summary. A decision log. Variations priced before the work happens.

There are also the chapters nobody writes. Living on site, and how to decide whether to. The low point in the middle that everyone hits and nobody warns you about. Neighbours. And what to actually do when a project is going seriously wrong, including the three kinds of delay and who properly carries each one.

It finishes with snagging done properly, the handover pack to insist on, and what to do in the first year so the work ages well and the eventual sale is straightforward.

Format: PDF, 36 pages, A4. Instant download after purchase. Read on any device or print at home.

Most renovations do not fail on the building work. They fail on decisions made late, money tracked loosely, and expectations nobody wrote down. The bricklaying is usually fine. The managing is where projects come apart.

Renovation Project Management is a 36-page illustrated handbook from award-winning London studio Akiva, written for homeowners rather than professionals. It assumes you have a job to hold down while all this is happening, and that nobody has ever explained how a building project is actually shaped.

It starts with the scope, because everything downstream inherits its clarity, and shows you how to write one a builder can price without phoning to ask what you meant. Then choosing a team, reading a quote properly, and the conversation that tells you more than any reference. Then contracts: what the document must state, how retention works, how to pay safely, and what insurance to verify before anyone starts.

UK edition: Written around JCT Home Owner contracts, CDM 2015 domestic client duties, the Party Wall Act and building control inspections, with prices in pounds.

EU edition: Written around national contract forms, Directive 92/57/EEC safety coordination and local building inspectorates, with prices in euros.

The middle chapters are about running a live project: the critical path and the lead times that quietly wreck programmes, a five-column money sheet that catches overruns while you still have options, and the four habits that prevent most renovation misery. A weekly meeting. A written summary. A decision log. Variations priced before the work happens.

There are also the chapters nobody writes. Living on site, and how to decide whether to. The low point in the middle that everyone hits and nobody warns you about. Neighbours. And what to actually do when a project is going seriously wrong, including the three kinds of delay and who properly carries each one.

It finishes with snagging done properly, the handover pack to insist on, and what to do in the first year so the work ages well and the eventual sale is straightforward.

Format: PDF, 36 pages, A4. Instant download after purchase. Read on any device or print at home.

STUDIO AKIVA GUIDESVOLUME 02 / PROJECT MANAGEMENT
WRITE IT DOWN, DECIDE ON TIME

Running the job without losing your mind: programme, trades, contracts, money and decisions.

See the eleven chapters 11 CHAPTERS · 36 PAGES · A4 PDF
Why this guide01

Most renovations do not fail
on the building work.

They fail on decisions made late, money tracked loosely, and expectations nobody wrote down. The bricklaying is usually fine. The managing is where projects come apart, and that is what this guide is about.

Written for homeowners, not professionals

It assumes you have a job to hold down while this is happening, and that nobody has ever explained how a building project is actually shaped.

The documents that protect you

What a contract must say, how retention works, how to price a variation, and what to verify before anyone starts.

The habits that prevent trouble

A weekly meeting, a written summary, a decision log and a five-column money sheet. Four habits that prevent most renovation misery.

Including the parts nobody warns you about

Living on site, the low point in the middle, neighbour relations, and what to do when it is genuinely going wrong.

36Pages
11Chapters
3Kinds of delay
7+Checklists & planner
What’s inside02
  1. 01The Brief and the ScopeWriting a scope that can actually be priced, the five scope traps, and why creep is mostly yours.
  2. 02Choosing Your TeamMain contractor or trades direct, how to read a quote, the warning signs and the conversation that tells you most.
  3. 03Contracts, Insurance and PaymentWhat the contract must state, retention, paying safely, insurance to verify and health and safety duties.
  4. 04Permissions and InspectionsWhat you may need, the inspection sequence, who is responsible, and why the completion certificate is the point.
  5. 05The ProgrammeThe critical path, lead times that quietly kill programmes, and a workable domestic build sequence.
  6. 06Controlling the MoneyOne spreadsheet with five columns, variations priced before they happen, cash flow and the costs people forget.
  7. 07Living Through ItStay or go, protecting what stays, the human side, and keeping neighbours on your side.
  8. 08Decisions and CommunicationThe weekly meeting, the decision log, deciding at the right level of detail and the decision deadline list.
  9. 09Problems, Delays and DisputesThe three kinds of delay and who carries each, handling quality issues, and what to do if it goes seriously wrong.
  10. 10Snagging and HandoverHow to snag properly, practical completion, the handover pack and the defects period.
  11. 11After the BuildThe house file, the first year, insurance and value, and a maintenance rhythm.
Sample pages03

A look at how the guide is laid out. Every chapter pairs plain-English guidance with something you can act on, a table, a checklist or a worksheet.

Renovation Project Management sample page, chapter openerIn the guide
Chapter opener
Renovation Project Management sample page, contract termsIn the guide
Contract terms
Renovation Project Management sample page, lead timesIn the guide
Lead times
Renovation Project Management sample page, money controlIn the guide
Money control
Renovation Project Management sample page, snagging listIn the guide
Snagging list
Renovation Project Management sample page, control sheetIn the guide
Control sheet
Choose your edition04
Cover of Renovation Project Management

The EU edition

This is the EU edition, referencing national contract forms, Directive 92/57/EEC and local inspectorates, priced in euros. A UK edition citing JCT contracts is on our UK site. Everything else is identical.

Add to basket using the button at the top of this page. Your download link arrives by email straight after checkout.

Questions05
What format is it?

A 36-page A4 PDF. You get a download link by email straight after checkout, and you can read it on any device or print it at home.

Is there an EU edition?

Yes. The UK edition references JCT Home Owner contracts, CDM 2015, the Party Wall Act and building control. The EU edition references national contract forms, Directive 92/57/EEC and local inspectorates, and prices in euros.

I have already started. Is it too late?

No. Chapters 5 to 9 are all about running a live project, and the money sheet, decision log and weekly meeting can be introduced at any point. If you are mid-build and it feels chaotic, start at Chapter 6.

Do I need this if I have hired a good builder?

A good builder makes the building work go well. This is about the half of the project that is yours: the scope, the decisions, the money, the consents and the paperwork. Being a well-organised client is what gets a good builder's best work.

Want someone in your corner?

Studio Akiva is an award-winning London interior design studio. If you would rather have professional eyes on your project, book a free fifteen-minute discovery call.

Book a discovery call